A practical guide for facilities in Louisiana and Texas
Title V operating permits pull all of a facility’s federal air requirements, and many state ones, into a single federally enforceable document. One of the most important and most misunderstood ideas in these permits is the deviation. It drives your semiannual reports and your annual compliance certification.
A deviation is an indication of non-compliance
Start with this: a deviation is an indication of non-compliance, not a finding of violation. When monitoring data, records, testing or plain observation show that an emissions unit did not meet a permit term or condition, you have a deviation, and you have to report it. Your job is to identify it, document it and report it on time. The agency’s job is to decide, based on the facts, the permit language and the underlying rule, whether it is a violation and whether enforcement is warranted. EPA’s definition says it directly: “A deviation is not always a violation” (40 CFR 71.6(a)(3)(iii)(C)). LDEQ’s Title V semiannual monitoring form instructions use the same definition and the same sentence.
That doesn’t make deviations harmless. Under 40 CFR 70.6(a)(6)(i) and LAC 33:III.507.B.2, noncompliance with a permit term is a violation of the Clean Air Act. Some deviations, such as an emission rate above a permit limit, will usually be treated as violations unless an applicable defense or a specific permit provision covers the event. Others are less clear-cut. A CAM excursion outside an indicator range, a gap in monitoring data, or a late report may or may not mean emissions were actually too high. The annual certification rule itself calls CAM excursions and exceedances “possible exceptions to compliance” (40 CFR 70.6(c)(5)(iii)(C)). The practical rule: report the deviation, explain it well, and let the facts carry the evaluation. Never decide on your own that something “wasn’t really a violation” and leave it off the report.
What counts as a deviation?
The Part 71 definition, which LDEQ’s form instructions adopt, covers any situation in which an emissions unit fails to meet a permit term or condition. It specifically includes:
- emissions that exceed an emission limitation or standard;
- process or control-device parameter values indicating that a limit or standard has not been met;
- observations or data showing noncompliance with a limit, standard, work practice or operating condition required by the permit; and
- an exceedance or excursion.
A deviation can be identified by observation or from testing, monitoring or recordkeeping data. Under the Part 71 definition, each 24-hour period of a deviation lasting more than 24 hours counts as a separate deviation, so check how your permit and agency count multi-day events.
Deviations aren’t limited to what your required monitoring shows. Under EPA’s 1997 credible evidence rule, any credible evidence—such as engineering calculations, other test or emissions data, or parametric monitoring data—can also be used to show compliance or non-compliance, so treat that kind of information as a possible deviation too (62 FR 8314, Feb. 24, 1997; 40 CFR 51.212(c), 52.12(c), 52.33(a), 60.11(g), 61.12(e)).
In practice, deviations fall into buckets that mirror the categories on LDEQ’s semiannual form:
- Emission limit exceedances: lb/hr or tons-per-year limits, often found through stack tests, CEMS or calculations.
- Operating parameters and work practices: control-device temperatures, pressure drops or flow rates outside permitted ranges; missed inspections; a work practice skipped.
- Missed or incomplete monitoring: a skipped reading, a lapsed analyzer, or a test not run on schedule. In Louisiana, Part 70 General Condition V sets a minimum data availability of 90 percent (monthly average) of the unit’s operating time for continuous or interval monitoring, unless the permit or a rule says otherwise. It does not apply to LDAR programs.
- Fugitive emissions and LDAR: missed monitoring periods or late repairs.
- Reporting and recordkeeping failures: a late or missing report or notification, or a required record that wasn’t kept. The missed report is a deviation in its own right.
- Other: for example, an emission source operating without being listed in the permit.
Risk Management Program requirements can create deviations too. The Part 70 definition of “applicable requirement” includes accident-prevention requirements under Clean Air Act section 112(r)(7) (40 CFR 70.2). Where your permit lists RMP elements, missed process hazard analyses, mechanical integrity inspections, training or plan updates belong in your deviation reports.
Deviation vs. violation vs. excursion vs. exceedance
| Term | What it means | Source |
|---|---|---|
| Deviation | Any situation in which an emissions unit fails to meet a permit term or condition. Must be reported. “Not always a violation.” | 40 CFR 71.6(a)(3)(iii)(C) |
| Excursion | Under CAM, a departure from an indicator range set for monitoring, consistent with the averaging period. | 40 CFR 64.1 |
| Exceedance | Under CAM, monitoring that reports in terms of the limit shows emissions (or opacity) above the limit, consistent with the averaging period. | 40 CFR 64.1 |
| Violation | The agency’s (or a court’s) determination that a requirement was not met. Permit noncompliance is a Clean Air Act violation. | 40 CFR 70.6(a)(6)(i); LAC 33:III.507.B.2 |
A CAM excursion tells you a control device may not have been working the way it should. That’s an indication, not proof, of excess emissions. CAM also requires you to restore normal operation as quickly as practicable, and the agency judges whether your response was acceptable from monitoring results, maintenance records and inspections (40 CFR 64.7(d)). Good response records are often what separates a reported excursion from an enforcement case.
The federal framework
Every Title V permit must require:
- Semiannual monitoring reports. Reports of required monitoring at least every six months, with “all instances of deviations from permit requirements” clearly identified and certified by a responsible official (40 CFR 70.6(a)(3)(iii)(A)).
- Prompt reporting of deviations. This includes deviations caused by upset conditions as defined in the permit, along with the probable cause and any corrective or preventive action. The permitting authority defines “prompt” (40 CFR 70.6(a)(3)(iii)(B)).
- An annual compliance certification. It must state whether compliance with each term was “continuous or intermittent,” identify each deviation, take each one into account, and go to both EPA and the permitting authority (40 CFR 70.6(c)(5)).
Louisiana (LDEQ) expectations
Louisiana’s Part 70 program adopts 40 CFR 70.6(a) by reference (LAC 33:III.507.B.2) and builds the details into general conditions that apply to every Part 70 permit (LAC 33:III.535):
- Semiannual monitoring report (Part 70 General Condition K). It is due March 31 for July through December and September 30 for January through June, and a responsible official must certify it. It’s required every period after the permit is issued, even during construction or when a unit isn’t operating. Starting with the 2026 first-half reporting period, LDEQ requires its own Semiannual Monitoring and Annual Compliance Certification forms.
- Prompt deviation reports (General Condition R). (1) A written report is due within seven days of any emission above permit requirements by more than the reportable quantity in LAC 33:I.Chapter 39. (2) Any emission above a permit limit, regardless of amount, that lasts seven days or longer needs a written report no later than 14 days from the start of the event. (3) All other deviations go in a semiannual deviation report, which can be combined with the General Condition K report.
- Annual compliance certification (General Condition M). It is due March 31 for the preceding calendar year, goes to LDEQ’s Office of Environmental Compliance and to EPA, and uses LDEQ’s form. You can reference earlier deviation reports by date instead of attaching them.
- Unauthorized discharge notifications. These are separate obligations under LAC 33:I.Chapter 39. A discharge that causes an emergency condition must be reported to the DPS hotline immediately, and no later than one hour after learning of it (LAC 33:I.3915). A non-emergency discharge above a reportable quantity must be reported within 24 hours (LAC 33:I.3917).
Staying under the reportable quantity avoids the hotline call. It does not make the event go away. Excess emissions below the RQ are still deviations and still belong in the semiannual report. LDEQ’s form instructions also warn that the responsible official can’t ignore information suggesting a deviation just because the permit’s designated compliance method didn’t flag one.
Texas (TCEQ) in brief
Under 30 TAC §122.145(2), deviation reports cover each six-month period and are due within 30 days after the period ends. No deviation report is required if there were no deviations. Reporting emissions events or maintenance, startup and shutdown activities under §101.201 or §101.211 does not substitute for Title V deviation reporting. TCEQ’s guidance treats recordable (below-RQ) emissions events as deviations. It also treats unauthorized maintenance, startup and shutdown emissions as deviations regardless of amount.
How deviations flow into your reports
- The event is logged when it is found.
- A prompt report goes out if a trigger applies (General Condition R, Chapter 39, an NSPS or NESHAP rule, or a permit-specific condition).
- The semiannual report lists every deviation for the period, including those already reported promptly.
- The annual certification carries each deviation into the continuous-or-intermittent call for every permit term.
If the log, prompt reports, semiannual reports and annual certification don’t match, inspectors notice.
Common causes at Gulf Coast plants
- Hurricane and tropical-storm shutdowns, restarts and power losses
- CEMS and analyzer downtime in heat and humidity, which eats into data availability
- Flare, thermal oxidizer and scrubber upsets during startup and shutdown
- LDAR monitoring missed during turnarounds or contractor changes
- Stack tests that slip past their due date, or are run at conditions the permit doesn’t allow
- Process changes made through management of change that never reach the permit-compliance calendar
- Late letters, because nobody owned the 14-day clock
Track deviations all year, not just in March
- Build a permit-condition inventory. List each specific requirement with its monitoring method and frequency. That is essentially Part 1 of LDEQ’s semiannual form.
- Keep one deviation log. Use the fields the form asks for: source ID, permit condition and citation, date and duration, description, cause, corrective action, and, for exceedances, pollutant, permitted limit and excess quantity.
- Triage within a day or two. Does this trigger a hotline call, a seven-day letter or a 14-day letter? Assign an owner and a due date.
- Check data availability monthly against your permit’s minimum.
- Review CAM excursions and CEMS data monthly, and record the response for each excursion.
- Close the loop. Track root causes and corrective actions until they’re done, since LDEQ’s form asks for both.
- Reconcile quarterly, so the semiannual report is a roll-up, not an investigation.
- Brief the responsible official early, with the supporting records in hand.
- Keep records at least five years (Part 70 General Condition I).
FAQ
Is every deviation a violation? No. A deviation is an indication of non-compliance. You report it, and the agency decides whether it’s a violation. Emission limit exceedances usually are violations unless a defense or permit provision applies.
Our emissions stayed below the reportable quantity. Do we still report? Yes. It’s still a deviation and goes in the semiannual report, even though no hotline call was required.
We had no deviations. Do we still file in Louisiana? Yes. The General Condition K semiannual monitoring report is due every period, and LDEQ’s form asks you to answer yes or no on deviations.
An exceedance has run for over a week. What’s due? Under General Condition R.2, a written report is due no later than 14 days from when the event started, regardless of the amount.
Who signs? A responsible official certifies the semiannual reports and the annual certification (40 CFR 70.5(d); LAC 33:III.502).
How ClearPath helps
The exact requirements for your site live in your Title V permit and the state rules behind it, so always check the specific language. This guide is educational and isn’t legal advice.
ClearPath Environmental Consulting helps plants track, evaluate and report Title V deviations all year. We build permit-condition inventories and deviation logs, triage events against LDEQ and TCEQ reporting clocks, and prepare semiannual reports and annual certifications on the current agency forms. We can work alongside your attorney when a deviation needs a closer look. Contact ClearPath to talk through your site.